ENERLATTICE
White Paper · EL-WP-03

Rules for the plant, the forecast, and the payment.

How ENERLATTICE measures solar supply, forecasts the interval, settles energy-sharing agreements in cryptocurrency, and rewards contribution in crypto or tokens.

Prefer the short version?1.2 · November 2026

1. Abstract

ENERLATTICE operates a solar power plant that supplies electricity and a member network that shares that electricity under explicit rules. Artificial intelligence forecasts production, consumption, electricity cost, and battery storage requirements. Blockchain infrastructure settles energy-sharing agreements. Members may receive electricity from the plant or contribute self-generated power. All transactions are conducted in cryptocurrency. Rewards for contribution are paid in cryptocurrency or tokens.

This white paper defines the protocol: the plant as anchor supply, membership directions, forecasting scope, metering requirements, agreement structure, settlement and reward mechanics, model limits, security assumptions, and governance of parameter changes.

2. Problem statement

Solar generation varies with irradiance. Member demand varies with use. Storage sits between them. Without a shared interval, forecasts, and settlement proof, energy-sharing agreements become vague: parties disagree on quantity, timing, and when payment is due.

  • Production must be forecast before the interval arrives, not reconstructed after the fact.
  • Consumption, price, and battery need must share the same clock as plant supply.
  • Payment and rewards must follow confirmed delivery, not an optimistic forecast alone.
  • A kilowatt-hour must not be both sold as plant supply and rewarded as contribution.

3. The plant and the lattice

The solar plant is the anchor supply. Inverters, revenue-grade meters, and the on-site battery report on a shared 15-minute operating interval. Members attach to that interval as load, as additional generation, or both under separate meter series.

3.1 Lattice definition

The lattice is the set of relationships among the plant, members, and storage for each interval. It is not a detached marketplace. Every agreement references plant-side supply or metered contribution that participates in the same settlement rules.

3.2 Interval

  • Canonical interval length: 15 minutes, aligned to coordinated universal time boundaries used by the plant.
  • Each interval carries plant export, member import, member export, and battery charge or discharge as separate quantities.
  • Settlement for an interval is independent of neighbouring intervals except where an agreement explicitly spans multiple intervals.

3.3 System components

The protocol treats four layers as distinct so that a failure in one does not silently rewrite another.

  1. 01Physical layer: solar arrays, inverters, revenue-grade meters, and on-site battery.
  2. 02Telemetry and forecast layer: signed interval readings and advisory model publications.
  3. 03Agreement layer: membership, direction, price or reward rules, and accepted device identities.
  4. 04Settlement layer: escrow, cryptocurrency payment, contribution rewards, and retained receipts.

Operators and members interact through statements and agreement status. Models and oracles never hold escrow keys. Administrative parameter changes are announced and time-delayed as described in Security.

4. Membership

4.1 Receive

A receiving member draws electricity supplied by the plant under an energy-sharing agreement and pays for the confirmed quantity in cryptocurrency once the meter proof for that interval is accepted.

4.2 Contribute

A contributing member adds self-generated electricity. Only metered, signed contribution is eligible for a reward. Rewards are denominated in cryptocurrency or in tokens issued against that export proof.

4.3 Dual membership

One membership may hold both directions. Each direction uses its own meter series. Protocol enforcement rejects double claims on the same kilowatt-hour.

  • Receive meter series accounts plant-supplied import only.
  • Contribute meter series accounts member export only.
  • Battery movements at the plant are not member contribution unless a separate export series is designated and signed.

5. Forecasting

Four model families publish on a shared horizon of up to 72 hours. Publications are advisory. They prepare the interval; they do not authorise settlement.

5.1 Forecast targets

  1. 01Solar production at the plant.
  2. 02Member consumption for receiving load.
  3. 03Electricity cost for coming intervals.
  4. 04Battery energy the plant is expected to hold or release.

5.2 Inputs and publication

  • Inputs include on-site irradiance, inverter history, member load history, published price series, and battery state of charge.
  • Each publication carries a point estimate, an error band, a model identifier, a timestamp, and a signature.
  • Operators may cite a forecast inside an agreement as context. The settlement quantity remains the accepted meter reading.

5.3 Drift and review

Persistent error against signed publications is retained so operators can inspect model drift. Forecast failure does not pause metering. It may pause automated recommendations that depend on that model until a replacement publication is signed.

6. Metering

Settlement depends on signed interval readings. Devices sign at the source. The settlement record stores the reading, device identity, interval bounds, and the agreement the reading applies to.

6.1 Metered channels

  • Plant export
  • Member import
  • Member export
  • Battery charge
  • Battery discharge

6.2 Failed signatures

A reading that fails signature or freshness checks is excluded from that interval. It is not repaired by substituting a forecast value. Disputed intervals enter an operator queue; they do not auto-settle.

7. Energy-sharing agreements

An agreement is the commercial object that binds parties to a direction, a meter series, a settlement asset, and optional reward rules for contribution.

7.1 Required fields

  • Parties and membership identifiers
  • Direction: receive or contribute
  • Meter series and accepted device identities
  • Settlement asset (cryptocurrency denomination)
  • Price rule for receive, or reward rule for contribute
  • Effective interval range and cancellation terms

7.2 Quantity and price

Quantity is the metered kilowatt-hours accepted for the interval, not the forecast quantity. Price for received power follows the agreement. Rewards for contributed power follow the reward rule and may be cryptocurrency or tokens.

7.3 Agreement lifecycle

  1. 01Draft: parties and rules are proposed; no escrow or rewards move.
  2. 02Active: meters listed in the agreement may produce settleable readings for the effective interval range.
  3. 03Paused: new intervals do not settle; historical receipts remain unchanged.
  4. 04Closed: the agreement no longer accepts readings; final statements are available for export.

Cancellation terms in the agreement define notice periods and whether prepaid escrow for future intervals is returned. Closing an agreement does not erase settled receipts.

8. Settlement and rewards

8.1 Receive settlement

Funds for a receiving interval sit in escrow until the meter proof for that interval is accepted. Cryptocurrency then moves to the plant side of the agreement according to the price rule and accepted quantity.

8.2 Contribute rewards

A contributing interval mints or transfers the reward only against the accepted export proof. Rewards are not a claim on unmetered generation and are not released by forecast publication.

8.3 Settlement flow

  1. 01Before the interval: forecasts publish; escrow for receive agreements is funded per the agreement schedule.
  2. 02During the interval: meters record plant export, member import or export, and battery charge or discharge.
  3. 03After the interval: signatures and freshness are checked; failed readings enter operator review and do not auto-settle.
  4. 04On acceptance: escrow releases for receive, or rewards mint or transfer for contribute; a statement and on-chain receipt are retained where applicable.
  5. 05On dispute: settlement for that interval stays frozen until operators resolve the reading; neighbouring intervals are unaffected unless the agreement says otherwise.

8.4 Double-claim prevention

Protocol checks bind each accepted kilowatt-hour to at most one commercial outcome. Plant export sold under a receive agreement cannot also be rewarded as member contribution. Member export rewarded under contribute cannot be billed again as plant-supplied import on the same series for the same interval.

8.5 Statements

  • Each statement lists interval bounds, quantity, payment or reward, meter reference, and agreement identifier.
  • Plant operators and members can export statements for books and personal records.
  • Blockchain settlement receipts are retained as the immutable payment trail where on-chain settlement is used.

9. Battery storage

Battery schedules may follow the storage forecast inside limits set by the plant operator. Surplus assigned to storage remains on site until a later interval needs it. Storage recommendations never bypass escrow or reward rules.

  • Dispatch advice is advisory unless an operator explicitly arms an automated policy within hard limits.
  • Battery charge and discharge remain separately metered channels.
  • Member contribution is never inferred from plant battery movement alone.

10. Limits of the models

Forecasting models may recommend a battery schedule and may appear in an agreement as context. They are forbidden from the following actions.

  • Releasing escrow
  • Changing a reward amount or eligibility
  • Dispatching the battery outside operator limits
  • Substituting for a failed meter signature

If a forecast and a meter disagree, the meter is the settlement quantity. The disagreement is retained for model review.

11. Security

  • Settlement contracts hold escrow and reward logic only.
  • Administrative keys are separated from oracle keys.
  • Meter signatures, agreement identifiers, and payment transactions form the audit trail.
  • Failed or replayed meter payloads are rejected and logged.

11.1 Parameter changes

Changes that affect price rules, reward rules, or which meters are accepted are time-delayed and announced to members before they apply. Emergency pauses may freeze new settlements without rewriting historical receipts.

12. Operations and member experience

Day-to-day use of the protocol is intentionally narrow: operators keep the plant and meters healthy; members manage agreements and statements; forecasts remain advisory context.

12.1 Operator duties

  • Maintain meter and inverter health so signed readings arrive on the interval.
  • Review disputed or unsigned readings without substituting forecast values.
  • Arm or disarm automated battery policies only inside published hard limits.
  • Announce and delay parameter changes that affect price, rewards, or accepted devices.

12.2 Member duties

  • Keep agreement direction, wallet, and meter series accurate.
  • Fund escrow on schedule for receive agreements.
  • Export only through designated, signed contribute meters when claiming rewards.
  • Retain statements for personal records; the protocol does not replace tax or regulatory advice.

12.3 Product surface

The product application presents agreement status, upcoming intervals, statements, and forecast context. It does not invent settlement quantities. Launch of the member application follows the public roadmap; until then, protocol rules in this document remain the source of truth.

13. Glossary

  • Interval — the canonical 15-minute window used for metering and settlement.
  • Lattice — the set of plant, member, and storage relationships for an interval under shared rules.
  • Receive — membership direction that draws plant-supplied electricity and pays in cryptocurrency after meter acceptance.
  • Contribute — membership direction that exports self-generated power and earns cryptocurrency or token rewards against signed export.
  • Escrow — cryptocurrency held until a receive interval's meter proof is accepted.
  • Oracle keys — keys used to attest meter or forecast publications; separated from administrative keys.
  • Statement — the exportable record of an interval's quantity, payment or reward, and references.

14. Governance and versioning

This specification is versioned. Material changes to settlement meaning require a new document revision and a delayed activation window. Editorial clarifications that do not change settlement behaviour may ship as patch revisions.

  • Current document: EL-WP-03 · 1.2
  • Last updated: November 2026
  • Companion overview: Light Paper EL-LP-02
  • Operational guide: Product user manual at /docs
  • Phased delivery: public Roadmap at /roadmap